Tuesday 26 September 2017

Feedback from Client

The design of each of the structures is an interesting concept but having them in the open farmland would make them clash with this environment. The maintenance of 5 different sites would increase the cost ad getting 5 different structures designed by an engineer would increase the cost and make it too costly.

No comments:

Post a Comment

Final models / booklet / map poster